A PHP Error was encountered

Severity: Warning

Message: simplexml_load_file(http://api.youku.com/api_ptvideoinfo/pid_XMTI5Mg_rt_2_id_XMTMxNDA1NTQzNg): failed to open stream: HTTP request failed! HTTP/1.1 404 Not Found

Filename: youku_ee/pi.youku_ee.php

Line Number: 87

A PHP Error was encountered

Severity: Warning

Message: simplexml_load_file(): I/O warning : failed to load external entity "http://api.youku.com/api_ptvideoinfo/pid_XMTI5Mg_rt_2_id_XMTMxNDA1NTQzNg"

Filename: youku_ee/pi.youku_ee.php

Line Number: 87

A PHP Error was encountered

Severity: Warning

Message: simplexml_load_file(http://api.youku.com/api_ptvideoinfo/pid_XMTI5Mg_rt_2_id_XMTI1MDQ2MTk3Mg): failed to open stream: HTTP request failed! HTTP/1.1 404 Not Found

Filename: youku_ee/pi.youku_ee.php

Line Number: 87

A PHP Error was encountered

Severity: Warning

Message: simplexml_load_file(): I/O warning : failed to load external entity "http://api.youku.com/api_ptvideoinfo/pid_XMTI5Mg_rt_2_id_XMTI1MDQ2MTk3Mg"

Filename: youku_ee/pi.youku_ee.php

Line Number: 87

拓日新能子公司联合中标5.41亿电站项目 | PV-Tech每日光伏新闻

拓日新能子公司联合中标5.41亿电站项目

  • 2016年11月25日
  • 作者: 刘宁宁

    刘宁宁

    电子邮件:.(JavaScript must be enabled to view this email address)

拓日新能

近日,深圳市拓日新能源科技股份有限公司(下简称“拓日新能”)发布公告称,拓日新能全资子公司青海拓日与华能青海发电有限公司、青海百能汇通新能源科技有限公司的三方联合体,收到中国机械设备工程股份有限公司关于青海格尔木光伏发电产业园区2016-1#地块50MWp光伏电站投资主体招标项目的中标通知书,确认青海拓日联合体中标青海格尔木光伏发电产业园区2016-1#地块50MWp光伏电站投资主体招标项目。

拓日新能表示,青海格尔木光伏发电产业园区2016-1#地块50MWp光伏电站投资主体招标项目总投资为38565.9万元人民币,青海格尔木光伏发电产业园区2016-7#地块20MWp光伏电站投资主体招标项目总投资为15485.33万元人民币,上述项目中标总投资金额合计为人民币5.41亿元。

(责任编辑:刘宁宁)

合作伙伴

鸣谢

Solar Media