A PHP Error was encountered

Severity: Warning

Message: simplexml_load_file(http://api.youku.com/api_ptvideoinfo/pid_XMTI5Mg_rt_2_id_XMTMxNDA1NTQzNg): failed to open stream: HTTP request failed! HTTP/1.1 404 Not Found

Filename: youku_ee/pi.youku_ee.php

Line Number: 87

A PHP Error was encountered

Severity: Warning

Message: simplexml_load_file(): I/O warning : failed to load external entity "http://api.youku.com/api_ptvideoinfo/pid_XMTI5Mg_rt_2_id_XMTMxNDA1NTQzNg"

Filename: youku_ee/pi.youku_ee.php

Line Number: 87

A PHP Error was encountered

Severity: Warning

Message: simplexml_load_file(http://api.youku.com/api_ptvideoinfo/pid_XMTI5Mg_rt_2_id_XMTI1MDQ2MTk3Mg): failed to open stream: HTTP request failed! HTTP/1.1 404 Not Found

Filename: youku_ee/pi.youku_ee.php

Line Number: 87

A PHP Error was encountered

Severity: Warning

Message: simplexml_load_file(): I/O warning : failed to load external entity "http://api.youku.com/api_ptvideoinfo/pid_XMTI5Mg_rt_2_id_XMTI1MDQ2MTk3Mg"

Filename: youku_ee/pi.youku_ee.php

Line Number: 87

多美尼加共和国拟在2018年前完成361MW可再生能源项目组合安装 | PV-Tech每日光伏新闻

多美尼加共和国拟在2018年前完成361MW可再生能源项目组合安装

  • 2017年04月10日
  • 作者: Conor Ryran

    Conor Ryran

    电子邮件:.(JavaScript must be enabled to view this email address)

  • 翻译: Yi Wang

    Yi Wang

    电子邮件:.(JavaScript must be enabled to view this email address)

相关八座项目将通过总额高达7.8亿美元的私人投资进行。图片来源:Jose Mesa / Flickr

相关八座项目将通过总额高达7.8亿美元的私人投资进行。图片来源:Jose Mesa / Flickr

多美尼加国家电力公司集团(CDEEE)日前宣布,集团已启动了八座可再生能源项目的开发工作,相关项目将可产生361.2MW可再生电力,并预计可在2018年实现联网。

相关公告由CDEEE执行副总裁Rubén Jiménez Bichara在可再生能源扶持计划启动仪式上宣布。相关八座项目将通过总额高达7.8亿美元的私人投资进行。

这些项目由三座太阳能电站和五座风能电站组成,将成为现规模为194.95MW的发电园区的一部分。

三座光伏项目均预计可在2018年开始运营,包括Montecristi太阳能投资1亿美元在Montecristi地区开发的Montecristi太阳能电站。该电站额定发电量为57.96MW。

另一个光伏项目是位于圣安东尼奥德格拉地区马塔德帕尔马(Mata de Palma, San Antonio de Guerra)的项目,额定发电量为50MW,投资总额为1.1亿美元;而另一座电站是由Emerald太阳能投资4000万美元的位于Barahona地区的25MW光伏项目。

Bichara 先生表示:“此举再次表明了多美尼加政府在扶持可再生能源方面的决心。”

(责任编辑:Yi Wang)

合作伙伴

鸣谢

Solar Media