A PHP Error was encountered

Severity: Warning

Message: simplexml_load_file(http://api.youku.com/api_ptvideoinfo/pid_XMTI5Mg_rt_2_id_XMTMxNDA1NTQzNg): failed to open stream: HTTP request failed! HTTP/1.1 404 Not Found

Filename: youku_ee/pi.youku_ee.php

Line Number: 87

A PHP Error was encountered

Severity: Warning

Message: simplexml_load_file(): I/O warning : failed to load external entity "http://api.youku.com/api_ptvideoinfo/pid_XMTI5Mg_rt_2_id_XMTMxNDA1NTQzNg"

Filename: youku_ee/pi.youku_ee.php

Line Number: 87

A PHP Error was encountered

Severity: Warning

Message: simplexml_load_file(http://api.youku.com/api_ptvideoinfo/pid_XMTI5Mg_rt_2_id_XMTI1MDQ2MTk3Mg): failed to open stream: HTTP request failed! HTTP/1.1 404 Not Found

Filename: youku_ee/pi.youku_ee.php

Line Number: 87

A PHP Error was encountered

Severity: Warning

Message: simplexml_load_file(): I/O warning : failed to load external entity "http://api.youku.com/api_ptvideoinfo/pid_XMTI5Mg_rt_2_id_XMTI1MDQ2MTk3Mg"

Filename: youku_ee/pi.youku_ee.php

Line Number: 87

SMA为内华达州94MW光伏项目选择逆变器合作伙伴 | PV-Tech每日光伏新闻

SMA为内华达州94MW光伏项目选择逆变器合作伙伴

  • 2017年03月31日
  • 作者: Conor Ryran

    Conor Ryran

    电子邮件:.(JavaScript must be enabled to view this email address)

  • 翻译: Yi Wang

    Yi Wang

    电子邮件:.(JavaScript must be enabled to view this email address)

Copper Mountain项目本期工程完工后,该项目所发电力将可满足约4.1万户加州居民的用电需求。图片来源:SMA

Copper Mountain项目本期工程完工后,该项目所发电力将可满足约4.1万户加州居民的用电需求。图片来源:SMA

SMA公司在本周二宣布,公司逆变器已被Amec Foster Wheeler公司选择用于Sempra Renewables旗下位于内华达州博尔德城的94MW Copper Mountain 太阳能四期项目。

SMA公共电力业务执行副总监Boris Wolff表示:“SMA为自己被选为该项目逆变器供应商,并与Amec Foster Wheeler和Sempra Renewables公司在此项目上进行合作而感到十分荣幸。此次使用的Sunny 2200-US中央逆变器在功率密度和高级公共事业级别功能集成领域均具有创新性意义。”

Amec Foster Wheeler公司太阳能项目总监Larry Myers补充道:“SMA逆变器凭借产品所具有的技术与能力、牢固的可靠性、产业知名度,以及我们从此前项目合作中对该公司及其产品的了解等优势,成为了此次项目的不二之选。”

(责任编辑:Yi Wang)

合作伙伴

鸣谢

Solar Media