A PHP Error was encountered

Severity: Warning

Message: simplexml_load_file(http://api.youku.com/api_ptvideoinfo/pid_XMTI5Mg_rt_2_id_XMTMxNDA1NTQzNg): failed to open stream: HTTP request failed! HTTP/1.1 404 Not Found

Filename: youku_ee/pi.youku_ee.php

Line Number: 87

A PHP Error was encountered

Severity: Warning

Message: simplexml_load_file(): I/O warning : failed to load external entity "http://api.youku.com/api_ptvideoinfo/pid_XMTI5Mg_rt_2_id_XMTMxNDA1NTQzNg"

Filename: youku_ee/pi.youku_ee.php

Line Number: 87

A PHP Error was encountered

Severity: Warning

Message: simplexml_load_file(http://api.youku.com/api_ptvideoinfo/pid_XMTI5Mg_rt_2_id_XMTI1MDQ2MTk3Mg): failed to open stream: HTTP request failed! HTTP/1.1 404 Not Found

Filename: youku_ee/pi.youku_ee.php

Line Number: 87

A PHP Error was encountered

Severity: Warning

Message: simplexml_load_file(): I/O warning : failed to load external entity "http://api.youku.com/api_ptvideoinfo/pid_XMTI5Mg_rt_2_id_XMTI1MDQ2MTk3Mg"

Filename: youku_ee/pi.youku_ee.php

Line Number: 87

PV-Tech PRO(第10期) | PV-Tech每日光伏新闻

PV-Tech PRO(第10期)

2015年04月
PV-Tech PRO(第10期)

2014,中国完成了35GW的组件制造,完成了新增10.64GW的新增装机。这一数字反映了中国光伏产业重新焕发生机。2015年初,国家能源局给出 的规划是17.8GW的基本任务,该指标还不包括屋顶分布式、自发自用的地面电站项目以及部分地区由国家能源局单独下发的指标,如果全部考虑进去,2015年中国新增光伏装机有望突破20GW!《冲浪中的中国光伏产业》为您回顾2014、展望2015。此外,光伏电站的技术可贴现性和公共事业规 模电站所遇到的技术挑战也是本期杂志的关注重点。

下载 (pdf, 8.5 MB)

合作伙伴

鸣谢

Solar Media